The details and procedure will work for Toyota 4Runner Vehicles.
The procedure is for
1GR-FE
2UZ-FE
5VZ-FE Engine models.
1GR-FE
2UZ-FE
5VZ-FE Engine
Car repair guide?
http://technoanswers.blogspot.in/2012/03/car-repair-guide.html
The procedure is for
1GR-FE
2UZ-FE
5VZ-FE Engine models.
Removal & Installation
1GR-FE
- Drain the coolant.
- Remove the oil filter.
- Remove the V-bank cover.
- Disconnect the 2 hoses from the cooler.
- Remove the bolt, washer and cooler.
- Installation is the reverse of removal. Use new O-rings. Torque the cooler bolt to 50 ft. lbs. (68 Nm). Torque the V-bank cover to 66 inch lbs. (7.5 Nm).
- Remove the engine under-cover.
- Drain the coolant.
- Drain the engine oil.
- Remove the oil filter.
- Disconnect the 2 hoses from the cooler.
- Remove the bolt, washer and cooler. Discard the O-ring.
- Installation is the reverse of removal. Use new O-rings. Torque the cooler bolt to 51 ft. lbs. (69 Nm).
- Drain the coolant.
- Disconnect the 2 hoses from the cooler.
- Remove the bolt, gaskets, cooler and O-ring.
- Installation is the reverse of removal. Use a new O-ring. Torque the cooler bolt to 43 ft. lbs. (59 Nm).
These details will help.
Thanks.
FOR MORE HELP GO TO: ---
No comments:
Post a Comment